New Arrivals/Restock

lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog

flash sale iconLimited Time Sale
Until the end
13
40
28

$18.60 cheaper than the new price!!

Free shipping for purchases over $99 ( Details )
Free cash-on-delivery fees for purchases over $99
Please note that the sales price and tax displayed may differ between online and in-store. Also, the product may be out of stock in-store.
New  $31.00
quantity

Product details

Management number 210561970 Release Date 2026/04/02 List Price $12.40 Model Number 210561970
Category

lynxking Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10ft 15ft 30ft 50ft for Small Medium Large Dog Blue and Purple 30ft

  • SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability
  • NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
  • LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won't get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.
  • SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.
  • SIZE: 3/8" (9.5 mm) in diam ,Size of this one is 50foot,color red, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose
Color Red
Pattern Checkered
Brand Name Lynxking
Closure Type Snap
Material Type Nylon
Target Species Dog
Item Dimensions L x W 600"L x 0.38"W

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Product Review

You must be logged in to post a review